Medway tunnel

The Medway Tunnel is a dual carriageway motorway tunnel. In the enclosed part only a central wall separates the two traffic tubes.

Project description

The tunnel width is 24 m. The actual structures are 1800 m long including 600 m enclosed section and the tunnel approaches. 
The immersed part of the tunnel consists of 3 elements of which two of 126 m and one of 120 m. All elements are built in the eastern approach. The project is tendered according to the “design and construct” method of the ICE.

Scope of work

In co-operation with Mott MacDonald design advice and support to the contractor Tarmac Construction Ltd. / HBM Civil Engineering Ltd. During the tender phase of the scope comprised the overall design of the tunnel elements and casting basin. 
After project award TEC delivered support to MM for the design of the tunnel, casting basin, the trench, immersion facilities and supervision of the works. Furthermore TEC carried out an independent design check category II on the immersed tunnel part. 

Project facts Medway tunnel

  • Client
    Tarmac Construction Ltd. / HBM Civil Engineering Ltd.
  • Duration
    1991 - 1995
  • Country
    United Kingdom
  • Project phase
    Completed
  • Location 
    Chatham-Rochester, Kent
Hans de Wit - Managing Director / Senior Consultant

Hansde Wit

Managing Director / Senior Consultant