The Marieholm Tunnel in Gothenburg is a road tunnel with three lanes per direction and a central gallery. The tunnel consists of an immersed tunnel section with cut & cover tunnel and open ramp sections at both ends. The immersed tunnel section crosses the Göta Alv river, measures 306m in length and is made up of 3 tunnel elements of equal length.The tunnel elements will be fabricated in a construction dock at the Marieholm-side of the crossing, within the alignment of the tunnel. The construction dock has room for a single tunnel element which requires the dock to be used 3 times for the IMT after which the cut & cover tunnel can be realised at that side of the crossing.
The tunnel elements will be segmented and will be placed in a dredged trench on a sandflow foundation.
Scope of work
Permanent civil works for the immersed tunnel section of the project:
- Preliminary design
- Final design
- Detailed design
Project facts Marieholm tunnel
- Client
- JV Marieholmstunneln (Züblin - Boskalis)
- Location
- Gothenburg
- In co-operation
- Arup, Centerlöf & Holmberg
- Project duration
- 2014-2016
- Country
- Sweden
- Project phase
- Detailed design