The Marieholm tunnel in Gothenburg is a road tunnel with three lanes per direction and a central gallery.
marie holmes tunnel

Project description

The Marieholm Tunnel in Gothenburg is a road tunnel with three lanes per direction and a central gallery. The tunnel consists of an immersed tunnel section with cut & cover tunnel and open ramp sections at both ends. The immersed tunnel section crosses the Göta Alv river, measures 306m in length and is made up of 3 tunnel elements of equal length.

The tunnel elements will be fabricated in a construction dock at the Marieholm-side of the crossing, within the alignment of the tunnel. The construction dock has room for a single tunnel element which requires the dock to be used 3 times for the IMT after which the cut & cover tunnel can be realised at that side of the crossing.

The tunnel elements will be segmented and will be placed in a dredged trench on a sandflow foundation.
 

Scope of work

Permanent civil works for the immersed tunnel section of the project:

  • Preliminary design
  • Final design
  • Detailed design

Project facts Marieholm tunnel

  • Client
    JV Marieholmstunneln (Züblin - Boskalis)
  • Location
    Gothenburg
  • In co-operation
    Arup, Centerlöf & Holmberg
  • Project duration
    2014-2016
  • Country
    Sweden
  • Project phase
    Detailed design
Piet  Barten - Specialist Immersed Tunnels

Piet Barten