The enclosed parts of the tunnels are 1500 m. The sections below the rivers will be constructed with the immersed tunnel technique, with seven elements of 150 m each. The cross section comprises two tubes with one track each. The tunnel is suited for trains with a cruise speed of 300 km/h.