Project description
For this crossing a tunnel has been constructed with a total length of 1.500 m accommodating 2x3 road lanes and a service / escape duct. The tunnel is suited for the transport of dangerous goods (category I).
The tunnel was constructed to replace the bridge on motorway A15 that contained a movable part that opened 8.000 times a year to allow the passage of the sea-vessels.
The enclosed part of the tunnel is 1.100 m. The section below the canal and the deep sections of the approaches are constructed using the immersed tunnel technique, with six elements of 115 m.
Scope of work
Civil and structural:
- Preliminary design and final design
- Structural calculations and drawings
- Geotechnical and geo-hydrological advisory
- Tender documents
- Cost estimates and construction planning
- Detailed design
- Advisory and supervision upon construction (in co-operation with the client)