Project description
For this crossing a tunnel will be build with a total length of 1500 m. The enclosed part of the tunnel is 1100 m. The section below the canal will be constructed with the immersed tunnel technique, with six elements of 115 m. The cross section comprises 2 motorway tubes with 3 lanes each. The tunnel is suited for the transport of dangerous goods (category I).
Scope of work
- Functional and design requirements
- Preliminary design and final design, including calculations, drawings and schemes
- Risk analyses
- Tender documents
- Cost estimates
- Review of contractors detailed design
- Monitoring and construction supervision