For this crossing a tunnel will be build with a total length of 1500 m. The enclosed part of the tunnel is 1100 m. The section below the canal will be constructed with the immersed tunnel technique, with six elements of 115 m. The cross section comprises 2 motorway tubes with 3 lanes each. The tunnel is suited for the transport of dangerous goods (category I).
TEC was responsible for the integrated E&M design for the complete tunnel.