Project description
The overall link comprises two major cable stayed bridges, with main spans of 230 m and 475 m respectively, and a 3.4 km long immersed concrete tunnel, located in a water depth of up to 40 m.
Scope of work
Technical Advisor for all aspects of the whole of the project and during all project phases, including:
- Cable stayed bridges
- Immersed concrete tunnel
- Dredging works
- Reclamation
- Approach roads
- Bored tunnels in hard rock
- Electrical and mechanical installations