Copyright: Femern A/S
Two custom-built Immersion Pontoons (IVY 1 & IVY 2) arrived at the work harbour near Rodbyhavn. These pontoons are designed for the transport and immersion of the 89 tunnel elements for the Fehmarnbelt tunnel. They measure 100 metres in length, 45 metres in width and can lift 8,000 t.
TEC is proud to contribute to this ambitious project. TEC is advisor to the client, Femern A/S, within the Ramboll-Arup-TEC Joint Venture partnership.